The gas dew point adjustment process requires the injection of MEG (Monoethylene Glycol) to prevent the formation of hydrates, which cause internal plugging in the process equipment. The recovered glycol must be regenerated to be used again.
💧 TEG (Triethylene Glycol) modules are used to remove the water present in the gas prior to its shipment to a gas pipeline or at the entrance to a gas plant.
This absorption process is preferably carried out at high pressure, and occurs inside a contactor tower through which the water vapor, present in the gas, is adsorbed by the liquid TEG, which is then sent to a module of regeneration similar to a MEG regenerator.
Estos productos pueden entregarse en varios paquetes o skids completamente terminados, para que durante el montaje en obra se realicen únicamente las interconexiones entre los mismos.
At FLARGENT S.A. We have the technical capacity to carry out our designs according to the particular specifications of our clients.