We continue to dispatch teams to develop the unconventional resources of the Vaca Muerta formation in the Neuquén Basin!
Flargent has more than 40 years of experience designing robust and reliable flaring and flaring systems. On this occasion we have considered the needs of a temporary operation, making a design that combines the high quality of our technology in flares, with a structural mechanical design that allows this system to have low mobilization, assembly and verticalization costs, without the need for make civilian bases in each temporary location.
Characteristics:
– Suitable for assembly without civil works
– Robust and compact
- Easy transport
– Quick assembly
– temporary operation
– Low cost of mobilization
– Quick assembly
– Capacity 500,000 SCMD
– Manufactured on frame
– Fixing system of 3 (three) x 120º retractable supports and external concrete dead
– Tip of burning gases with fluidic seal and pilot
– Vertical stack with integral drop separator
– Electric ignition
– Weight: 2300 Kg
– Dimensions: 2.4m x 2.0m x 6.2m
From Flargent we accompany the development of the unconventional resources industry by providing comprehensive solutions according to the particular specifications of our clients!
